JOURNAL OF LIGHT INDUSTRY

CN 41-1437/TS  ISSN 2096-1553

Volume 27 Issue 4
July 2012
Article Contents
LI Meng and ZHANG Yun-bo. Research on schedule risk in power construction project using Bayesian network[J]. Journal of Light Industry, 2012, 27(4): 98-101. doi: 10.3969/j.issn.1004-1478.2012.04.025
Citation: LI Meng and ZHANG Yun-bo. Research on schedule risk in power construction project using Bayesian network[J]. Journal of Light Industry, 2012, 27(4): 98-101. doi: 10.3969/j.issn.1004-1478.2012.04.025 shu

Research on schedule risk in power construction project using Bayesian network

  • Received Date: 2011-11-03
    Available Online: 2012-07-15
  • Schedule risk factors of power projects are quantified by Baysian networks (BN) model.Results showed that five kinds of risk factors such as poor weather conditions,tight project schedule,low-skilled jobs,lack of equipment and not timely supplier will directly impact on project schedule.Factors including not timely supplier,low technical work ability,improper plan arrangement are sensitive to project schedule,which should be the focus of control.
  • 加载中
    1. [1]

      Raz T,Michael E.Use and benefits of tools for project risk management[J].Int J of Project Mana,2001,19(1):9.

    2. [2]

      Miller R,Lessard D.Understanding and managing risks in large engineering projects[J].Int J of Project Mana, 2001,19(8):437.

    3. [3]

      Zou P X W,Zhang G M, Wang J Y.Identifying key risks in construction projects:Life cycle and stakeholder perspectives[C]//Proc 12th Pacific Rim Real Estate Society Conf,Auckland:IEEE,2007.

    4. [4]

      徐莉.技术经济学[M].武汉:武汉大学出版社,2003.

    5. [5]

      刘晓君,刘洪玉.工程经济学[M].北京:中国建筑工业出版社,2008.

    6. [6]

      蒋晓静,黄金枝.工程项目的风险管理与风险监控研究[J].建筑技术,2005(7):537.

    7. [7]

      董立岩.BN应用基础研究[D].吉林:吉林大学,2007.

    8. [8]

      Wang S Q,Tiong R L K,Ting S K,et al.Evaluation and management of foreign exchange and revenue risks in China's BOT projects[J].Constr Manage Econom,2000,18(2):56.

    9. [9]

      樊宁.贝叶斯网络推理算法研究[J].信息技术,2011(2):35.

    10. [10]

      冷翠平,王双成,王辉.动态贝叶斯网络结构学习的依赖分析方法研究[J].计算机工程与应用,2011(3):145.

    11. [11]

      赵红,李雅菊,宋涛.基于BN工程项目风险管理[J].沈阳工业大学学报:社会科学版,2008, 7(3):240.

Article Metrics

Article views(957) PDF downloads(25) Cited by()

Ralated
    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return