QIAO Xi-hua, PENG Xing-xing, MAO Qian-bei and et al. EM277 station missing factors of Profibus DP network analysis and solutions[J]. Journal of Light Industry, 2015, 30(2): 93-98. doi: 10.3969/j.issn.2095-476X.2015.02.020
Citation:
QIAO Xi-hua, PENG Xing-xing, MAO Qian-bei and et al. EM277 station missing factors of Profibus DP network analysis and solutions[J]. Journal of Light Industry, 2015, 30(2): 93-98.
doi:
10.3969/j.issn.2095-476X.2015.02.020
EM277 station missing factors of Profibus DP network analysis and solutions
-
College of Electric and Information Engineering, Zhengzhou University of Light Industry, Zhengzhou 450002, China;
-
College of Food Science and Engineering, Northwest Agriculture and Forestry University, Xi'an 712100, China;
-
Collaborative Innovation Center of Textile and Garment Industry in He'nan Province, Zhengzhou 451191, China
-
Corresponding author:
WANG Yong-hua,
-
Received Date:
2014-10-17
Available Online:
2015-03-15
-
Abstract
According to station missing phenomenon of EM277(communication interruption) in the Profibus DP network system running process,based on the built Profibus network experiment platform,working environment factors such as the electromagnetic interference(EMI), grounding system,the settings of network parameter and so on were simulated,and combined with Profibus network message analysis,the phenomenon of EM277 station missing was analyzed. The corresponding engineering solution was proposed: reasonably setting up network system parameters,adding repeaters to realized the effective amplification and regeneration treatment,shielding and correcting grounding of network equipment and communication cables to inhibit EMI. etc. The feasibility of the scheme was verified by engineering examples.
-
-
References
-
Proportional views
-
-